msproject
This package was deleted from PyPI around 2024-02-21. Installing fails with:
$ pip3 install msproject
ERROR: Could not find a version that satisfies the requirement msproject (from versions: none)
ERROR: No matching distribution found for msproject
Install through StableBuild
You can install this package from StableBuild's PyPI snapshots from before the version was deleted:
Sign up for StableBuild to get an API key (it's free and takes <60 seconds!)