msproject
0.1.1
This version was deleted from PyPI around 2024-02-21. Installing fails with:
$ pip3 install msproject==0.1.1
ERROR: Could not find a version that satisfies the requirement msproject==0.1.1
Install through StableBuild
You can install this package from StableBuild's PyPI snapshots from before the version was deleted:
Sign up for StableBuild to get an API key (it's free and takes <60 seconds!)
Or, download files manually
And install manually via pip:
msproject-0.1.1-py3-none-any.whl
(96.7KB)
msproject-0.1.1.tar.gz
(192.6KB)